Infrared & electric heating since 2008Personal advice · 0165 – 714107
← Back to all articles

17 May 2026 · HEATXL KNOWLEDGE & INSPIRATION

Infrared panels in a rented home: agreements and mounting

Illustration of two people on a sofa beside a white square wall panel in a bright living room

If you want to use infrared panels in a rented home, clarify the proposed positioning and any alterations before buying. A standalone appliance, drill holes and electrical alterations have different impacts. Record your agreement with the landlord on execution, costs and the end of the tenancy.

Key points

Alongside applicable rules, check the tenancy agreement, general terms and policy on tenant-installed alterations. Describe mounting and power supply specifically. Obtain written permission where necessary and clearly record maintenance, ownership, takeover and reinstatement. Technical product advice does not independently determine your tenancy-law position.

Tenant-installed alterations: check the agreements

Dutch landlords often use the term tenant-installed alterations, or ZAV. The Dutch government distinguishes minor alterations from renovation: minor changes that can be reversed without substantial cost need no permission; renovation does. Which category your panel installation falls into depends on the actual work, not the product name infrared panel.

Before work, clarify whether the existing heating will remain operational and who may alter it. Agree when a response is due and retain correspondence. No response is not a practical basis for assuming consent. In a substantive dispute, have your particular situation assessed by a tenancy-law specialist.

When should you discuss permission with your landlord?

Describe whether the appliance is standalone or fixed, where drilling is required and how power will be supplied. Even a plug-in product can raise questions about load, use or house rules. Whether an alteration is minor and easily reversible depends on the actual situation. Do not turn a few drill holes into a universal permission requirement, but equally do not assume all wall mounting or fixed electrics can proceed without coordination. Check before ordering.

For new wiring, circuits or other fixed alterations, clarify beforehand who grants permission and who carries out the work. Have technical suitability assessed together with other electrical loads. A general current limit or a few screws provides insufficient information about the implications for the home and required coordination.

A proposal with realistic benefits

Describe the intended comfort improvement and how you will limit unnecessary operating hours. Support output and positioning choices and state which existing installation remains. Do not promise fixed energy savings, higher property value or an improved energy rating without assessing the whole building and use. Effects on other rooms must also be clear.

An electric panel involves no combustion at the point of use but has electrical and thermal safety requirements. It does not automatically dry the building structure or remedy leaks or mould sources. Ventilation, moisture control and maintenance remain important. Compare lifespan and warranty per product, including electronics and connections.

Steps towards a clear application

First gather the tenancy agreement and current landlord instructions. Then prepare a plan covering product type, position, fixings, supply and controls. Add heating-demand and electrical-assessment data. Submit it in writing and ask what information is missing. Complete necessary permission and technical coordination before altering the home or placing an order based on those alterations.

Record who pays for purchase, installation, energy, maintenance and repairs. Discuss ownership, removal, possible takeover and reinstatement on departure. Also describe how existing facilities must be left and who may reverse electrical alterations. A takeover payment or compensation does not automatically follow from the investment.

Our technical support for your application

We help private and business end users, installers and wholesalers with product data and a suitable combination of panel, mounting and controls. For rented homes, photos, dimensions and landlord requirements can help selection. We provide technical information; legal permission, contract interpretation and financial agreements need separate assessment by the parties involved.

Clear handover and completion

Keep consent, drawings, before-and-after photos, product documents and settings. Check the work matches the approved plan. If the design changes, record the revised agreements too. Good documentation helps maintenance and discussions of the home’s condition at the end of the tenancy.

Request a quotation

Frequently asked questions about permission

Does installation affect my deposit?

That depends on the specific agreements, execution, any damage and the departure assessment. Mounting permission does not automatically determine later reinstatement or deposit decisions. Record the original condition and reinstatement arrangements and have doubts about your contract or rights assessed separately.

Sources and principles

HEATXL · PRODUCTS, EXPERTISE AND SUPPORT

A good plan starts
with personal advice.

For your home, installation or business project.

View the full range Request a quote ↗0165 – 714107Mon–Fri 9:00–12:00 and 13:00–17:00

HEATXL · DESIGN PREVIEW

HEATXL

What are you looking for?

Type at least 2 characters to search.